As in the UK we were previously asking a French-Chinese partnership to build here so not sure why Canada didn’t get chosen for that.
Its crazy how fast britain has fallen off nuclear, the original british nuclear rollout should have stood the UK up as a permanent nuclear energy powerhouse but France took it from them.
If it is anything like all my french cookware, it will be done wonderfully.
[0] https://www.atkinsrealis.com/en/markets-and-services/markets...
Some black swan event could kill solar. Maybe some mega volcano explodes. It would suck to be 50+% dependent on it in that case.
We should have wind, solar, nuclear, geothermal, hydro, tidal, and even fossil fuels. We should have a total capacity in greater abundance than what we have today so that we can grow.
Though that only moves the needles from impossible to laughable.
> If our goal is to double our grid and build a low-carbon economy in less than 25 years, there is no credible plan to do that without nuclear energy
There are plenty of credible plans, they all involve wind and solar. But as anyone watching clean energy news will know, Alberta is trying its hardest to get rid of all wind and solar development from the province.
As for the baseload argument, they already get >60% of the electricity from hydro and nuclear. How much more baseload do you really need? 100%?
This as well as the failed pipeline projects have made Canadian infrastructure projects very high risk from a lending perspective, becuase there's now a non-insignificant risk that a province can welch out of financing a deal purely for short term political gain.
[0] - https://thenarwhal.ca/alberta-renewable-energy-investment-co...
The high-profile project cancellations people point to weren't a government ban. They happened because the province changed its transmission rules. Previously, ratepayers subsidized the massive utility costs required to connect remote wind and solar farms to the central grid. The province ended this, forcing private developers to internalize their own grid connection costs. Once forced to pay for their own infrastructure, highly speculative, unfinanced projects simply became economically unviable and dropped out of the queue.
If a private wind or solar developer wanted to build a massive farm in a remote, rural area (like Southern Alberta) where land is cheap but high-voltage power lines do not exist, they only had to pay for the immediate wire connecting their project to the nearest local substation. Taxpayers were subsidizing those players, because it was a "load pays" system.
Please do not fall pray to the general trope that Alberta is a backwards hillbilly province. Subsidizing private developments with public money is not something that should be encouraged.
On Canada broadly, you are correct in your baseload numbers and I agree with you.
(Energy trader here)
What other kind of subsidy is there?
0 - https://www.neimagazine.com/news/darlington-smr-secures-fina...
It is not just a small boiling water reactor. It is a 300 MW-electric boiling water reactor, and if successful, it will be followed by 3 more of the same type for a total of 1.2 GW-electric. That is more than an AP-1000 reactor, and much less risky.
There are two South Korean plants (Kori, Hangul) larger than Bruce
We need responsible growth. We need to acknowledge that there is no magic bullet for power generation, just managed risks. We need to acknowledge that those risks exist for all power sources, to varying degrees, and take different forms (whether it is the environmental impact or reliability of the power grid).
I'm all down with spamming nuclear plants but will that, in the end, give free electricity to the consumer? Lower the rates? ..or just continue to be an economic weapon against the masses?
So, yeah, it makes sense that they love nuclear now -- blank cheque to drag on for multidecades over budget. Likely the right people donated the right funds to the PC party and/or attended/funded Ford Fest
The first thing this government did when it got into power was pay out hundreds of millions in penalties for cancelling large wind projects, and for breaching its contract and exiting the cap and trade agreement with California and Quebec.
Ford loves to waste money and then wag his finger about how everyone else is fiscally irresponsible.
Honest question; here in the USA we have not.
- one of the largest uranium reserves
- a well respected and safe nuclear design in CANDU
- experience with building and refurbishing nuclear reactors(Darlington)
and for Ontario itself A need for more baseload to work with the large amount of solar and wind that Ontario has added in the last 10 years.
Saskatchewan also now has a potential need for nuclear for industrial use now that wasn't present before from its existing population.
if the government can clear the red tape by using a well tested reactor design then they could certainly get some of these reactors built in that time frame.
15 seems...ambitions, but if we're going to spend at a federal level this is probably one of the better things to invest in.
That's not serious. Construction start is too far away.
I can't help but think its a sign that those concerns were easy to hold when energy was cheap and you could actually trust your neighbors. If that's the case, again huge speculation, it sure makes the concerns feel a bit hollow now.
2005 ish - UK government release energy strategy and declares fission power plant intent.
2010 ish - UK government formally announces Hinkley Point site. It's declared the first reactor will come online 2019.
2019 - it does not.
2026 - best estimate is now 'around 2030'.
Historical cost estimates are an utter quagmire - but roughly estimated at £18 billion a decade ago, back when it was estimated to be online last year.
Current estimates - bring your own hubris - are roughly £46 billion.
This story has been beaten to death, I know - but recall, this is a country with some history of building and operating nuclear fission power plants, with convenient (2h by rail) access to a lot of expertise from France, and it's a joint-venture with China General Nuclear Power Group so presumably plenty of expertise to draw upon there.
Even if Canada winds up relying more on CANDU reactors than SMR's, there is a case to be made for enriching domestically. There are a lot of potential customers looking for a reliable, ethical supplier. Canada has the raw minerals, political stability, and a long record of refusing to weaponize despite having the capability.
I think it's better to just outsource it to Koreans at least that way you can stay on budget and on time.
I hope Jimmy Carter's ghost will be just as willing to help us out the next time a reactor goes into meltdown as his physical self was the first time that happened. RIP Jimmy Carter.
Just ONE square mile of batteries and a TOTAL of 100 x 100 square miles of Solar can power the entire USA 24/7. Area required will be much lesser for Canada.
See : https://finance.yahoo.com/sectors/energy/articles/elon-musk-...
Jokes aside, Canada is well positioned to lead a nuclear renaissance, now that they have easy access to raw materials, easy access to cooling facilities and they can export surplus to energy hungry neighbor, it also makes it a good candidate for hosting lots of datacenters
just join the US already
We should have more nuclear, but they should be run for profit to hold them to account instead of massively indebting them to create public sector crony slush funds the way the current hydroelectric system has been run into the ground.
Relying on Trump or any other clown, makes no more sense.
Wind and solar could be deployed for a fraction of the proposed $100 billion investment and should be considered as part of the interim solution, while nuclear remains a long-term strategic project.
Rather than pursuing such an ambitious build out, a more practical approach might be to scale back the plan and focus on constructing one reactor each in Alberta, Saskatchewan, and Manitoba as an initial phase.