You can definitely get equipment that can do symmetrical input/output, but if you actually model out the supply and demand curves on the system it's not usually going to be worth the extra up front expense since peak input is a small portion of the day and that extra hardware will mostly sit idle.
For that matter people often design systems where peak input can't even be accepted by the inverter and the extra power is just wasted, because it's more valuable to have a steady input over a long period than to maximize the daily peak.