Its much cheaper, quicker and easier to use cooling blocks with leak proof quick connectors to do liquid cooling. It means you can use normal equipment, and don't need to re-re-enforce the floor.
A lot of "edge" stuff has 12/48v screw terminals, which I suspect is because they are designed to be telco compatible.
For megawatt racks though, I'm still not really sure.