https://english.hani.co.kr/arti/english_edition/e_national/8... talks about the Shin Kori 3 and 4 reactors (brought online in 2016 and 2019) costing $6.4B USD for the pair (after a 32% cost overrun), if I'm reading correctly. Those ones are 1416MW and 1418MW, or $2258/kW which is right in line with GE's estimate of a next-of-a-kind SMR build (spec sheet says $2250/kW)