Consider every dollar spent as an interest baring loan. Spending money on a power plant not used wastes it and making everything more expensive.
Scalable loads makes the return on investment for variable load renewables and constant load nuclear much better. The most expensive power are the peaker plants that have to run only a handful of hours per day.
More scalable grid connected loads like aluminum processing makes building capacity and especially renewable capacity cheaper.