Skip to content
Better HN
Top
Best
Ask
Show
New
Jobs
Search
⌘K
0 points
drodio
4y ago
0 comments
Save
Share
San Mateo: under 120 sq ft; no electrical.
0 comments
3 comments · 1 top-level
top
newest
oldest
jefftk
4y ago
· 2 in thread
Thanks! Quickly looking at the rules, it doesn't look to me like the issue is whether you're connected to the grid? If you have high-voltage wiring (50V+) it looks to me like you still need to get that permitted and inspected?
zeckalpha
4y ago
Don’t have HV then, at least as part of the structure. Say, 14.8V DC and a removable 120VAC inverter.
jefftk
4y ago
Sure, but you could also run 48V from the main structure, no?
j
/
k
navigate · click thread line to collapse