>"The test unit was installed in the center of the test chamber with a blade height of 93” from the floor. The test chamber measured 10' x 10' x 10' (3m x 3m x 3m) and a microbial suspension was aspirated into the chamber. Air samples were taken from the test chamber once the unit was turned on, and then at client specified intervals (0, 5, 10, 15, 20, 30, 45, 60, 90 and 120 minutes) over a period of 2 hours and then plated. "
https://www.bigassfans.com/docs/clean-air/104380072COL-010-i...
A small, sealed chamber were particulates were sprayed into the air once? Test that thing in a restaurant or a hair salon with a dozen people continuously interacting in it and then test the quality of the air