I don’t know — just imagine how many places the mains power is tied into all of the buildings. Each of those places would also need a mains cutoff,
and they would need to all be thrown/active at the same time before the cogen plant could be activated independently. At a place the size of UC Berkeley, that would be a pretty big cost (and logistical nightmare).
If the system wasn’t designed for the switchover from the beginning, I can see how it would be considered impossible/not practical to do. Especially when this type of “blackout” was thought to be rare.
I’m sure the prior assumptions would be reconsidered today.