90-95% of all new generation coming online each year are renewables in the US. Renewables cost continues to decline year over year, speeding its uptake. I cannot fathom how one would think nuclear can compete at all in such an environment.
https://www.eia.gov/todayinenergy/detail.php?id=31192
“Nearly all nuclear plants now in use began operation between 1970 and 1990. These plants would require a subsequent license renewal before 2050 to operate beyond the 60-year period covered by their original 40-year operating license and the 20-year license extension that nearly 90% of plants currently operating have either already received or have applied for. The AEO2017 Reference case projections do not envision a large amount of new nuclear capacity additions. By 2050, only four reactors currently under construction and some uprates at existing plants are projected to come online.”
Super-expensive safety regulations are often based on the linear no-threshold model of biological dose response. There is more and more data showing that this is illogical at very low doses. Changing that is highly political.
The large 3-shift security staff at nuclear power plants is based on political concerns.
The contractor and financing models in play in the US to build nukes causes lots of misalignment, and contracts end up suing each other over trivialities rather than building the plant like the Koreans do or French did (in the 1970s). That's nearly political.
Anti-nuclear intervenors watch over plant plans and try to delay at all costs. Totally political.
Whether the race is rigged is irrelevant; the race is over.
There is no reason why a grid needs any baseload sources whatsoever.
Again it doesent matter how much come online it matters if it replaces fossile or nuclear in any significant way, it doesent, its unreliable.