Actually, that’s not true.
For the mid-size launches that SpaceX is billing 62m$ for, Ariane bills 60m$ for.
What Arianespace offers at 130m$ is instead something SpaceX isn’t even offering currently, as their second stage is far inferior to Ariane’s.
(Ariane always bundles a 130m$ and 60m$ contract per launch together).
If SpaceX can relaunch the rockets multiple times, that might reduce the cost indeed, but they also have far increased labor costs up ahead, as they can’t keep everyone working overtime for free forever.